fbpx

F-WAVE™ REVIA® 
installation Inspection Form

Thank you for choosing F Wave for your recent installation! To ensure that the installation meets our quality standards, please complete our REVIA® Installation Inspection form. We will review your submission and will contact you if we see anything that should be corrected. With every passing REVIA® installation inspection, you will be rewarded with a $50 gift card! Installation photos should be submitted within 90 days of your installation date to be eligible for reward.

Photo Submission Requirements

Please upload at least one image for each type of angle. A team member will review the submitted photos, and follow-up with an email confirmation and tips regarding your new shingles. 

Accepted file formats are png and jpg. In addition, by providing your images you agree to allow F Wave to edit them and to use in marketing materials and digital channels.

Warranty Registration

Please note that submitting this form does not register your warranty with F Wave. To complete your warranty registration please go to our Warranty Page for more information and the next steps to get registered.

Note: You may upload up to 5 images per angle. To upload multiple images, please select all the images when uploading. Uploading them one by one will replace the previous image. You will know you’ve successfully uploaded multiple images, when you see the number of files listed (example: “2 Files”. 


This is an evolving program and subject to change at any time.

Shingle Production Lot

Record the Lot number of the Bundle or of the shingle.

Bundle code or shingle lot

Correct Adhesive for Flashing

Ensure that you are using an adhesive that is compatible with F Wave shingles. Approved adhesives are RM-Lucas 6600, Mule-Hide SEBS1, NPC Solar Seal 900, OSI Quad. See F Wave's Approved Sealants & Adhesives or consult the F Wave installation manual.

4 correct adhesive tubes

Deck Condition

F Wave is a premium product that provides excellent visual depth and performance. However, the visual appearance and performance are dependent on a good foundation and by this we mean the roof deck. Before installation, all previous shingles, underlayments, nails, and other debris must be removed so the surface is smooth. Any worn, sagging, or rotted decks sections must be replaced. Any uneven/unlevel transition sections between OSB/Plywood sections must be corrected.

Clear and clean deck down to the bare plywood or OSB deck

Starter Shingle Application

F Wave Starter shingles must be nailed with 6 nails located 1 inch up from the edge. The start should not be overhung more than 1/2 inch past and L style drip edge or flush with a D style drip edge. Be sure to install underlayment over the top of the drip edge metal and down to the edge of the drip edge.

starter with 6 nails installed 1

Field Shingle Application

F Wave Field shingles must be installed with 6 nails per shingle and with a 1-1/2 tab offset. Shingles should be installed using the alignment marks to add with a level installation and allowing for a 6 inch exposure.

shingle with 6 correctly placed nails & 1-1/2 tab offsett

Roof to Wall & Rakes

When F Wave shingles are installed at a rake, we suggest that our T Style rake metal be used. Install with a 1/2 inch gap between the shingles and the edge of the metal. For a Roof to wall, use step flashing additional adhesive to secure the shingles. Allow for a ½ inch gap between the shingle and step flashing.

Rake edge or roof to wall with 1/2 gap between shingles and the edge of the metal

Valley Installation

When F Wave shingles are at a valley, be sure to cut a 1” diagonal at the top of the head-lap. In addition, be sure to install additional adhesive in the head laps to seal the valley edges.

Valley install in progress with the diagonal cut and adhesive in the head-lap

Hip/Ridge Installation

When F Wave Hip/Ridge shingles are installed, be sure to use a 1-3/4” nail or longer to ensure penetration through the deck. Apply one nail on each side in the “Nail Here” mark. Apply the H/R shingle so the leading edge is aligned to the raised flat area of the shingle below. Do not cheat the exposure length.

H/R shingle being installed with the correct exposure

Field Shingles Final Inspection

Apply pressure to every shingle tab to ensure seal down. This can be done by walking on each tab glue line. Using a person on the ground as spotter, identify any unsealed tabs and ensure they are sealed. Examples of reasons they may not seal include un-driven nails, roof debris, and underlying deck condition. If the tabs are not sealed within a few days of the install, the adhesive will become too dirty to seal on its own.

From the ground looking up at the roof plane showing all tabs are sealed

Hip/Ridge Shingles Final Inspection

Apply pressure to every Hip/Ridge shingle tab to ensure seal down. This can be done by walking on each tab glue line. Using a person on the ground as a spotter, identify any unsealed tabs and ensure they are sealed. Example of reasons they may not seal include un-driven nails, roof debris, and nailing in the wrong place. If the tabs are not sealed within a few days of the install, the adhesive will become too dirty to seal on its own.

From the ground looking up at the ridge or hip roof plane showing all H/R tabs are sealed